CoreSite

CoreSite
ConXL Complete
Frame erected in 9 working days
Location: Santa Clara, CA
Total sf: 101,000
Owner: CoreSite
GC: Matt Construction
Engineer: FBA Engineers
Architect: DCM

PROJECT NARRATIVE

CoreSite’s Santa Clara data center at 2972 Stender Way was built to LEED Gold standards, featuring 101,000 square feet and energy-efficiency initiatives such as 97%-efficient UPS units, variable-frequency driven (VFD) cooling units, and air-side economization. The data center project is a part of CoreSite’s planned 496,000 square foot Santa Clara data center campus at Coronado Drive and Stender Way. ConXtech’s ConXL System was used in the project and the frame was erected in 9 working days.

 

PROJECT CHALLENGES / SPECIAL CONSIDERATIONS

The ConXL System addressed CoreSite’s need for a robust, long-span steel data center frame delivered cost-effectively and with increased speed to market.

 

PHOTO GALLERY


Download Project Sheet