| ConXL Complete | |
|---|---|
| Frame erected in 9 working days | |
| Location: | Santa Clara, CA |
| Total sf: | 101,000 |
| Owner: | CoreSite |
| GC: | Matt Construction |
| Engineer: | FBA Engineers |
| Architect: | DCM |
PROJECT NARRATIVE
CoreSite’s Santa Clara data center at 2972 Stender Way was built to LEED Gold standards, featuring 101,000 square feet and energy-efficiency initiatives such as 97%-efficient UPS units, variable-frequency driven (VFD) cooling units, and air-side economization. The data center project is a part of CoreSite’s planned 496,000 square foot Santa Clara data center campus at Coronado Drive and Stender Way. ConXtech’s ConXL System was used in the project and the frame was erected in 9 working days.
PROJECT CHALLENGES / SPECIAL CONSIDERATIONS
The ConXL System addressed CoreSite’s need for a robust, long-span steel data center frame delivered cost-effectively and with increased speed to market.