| ConXL Complete | |
|---|---|
| Location: | San Mateo, CA |
| Total sf: | 64,700 |
| Owner: | Kaiser Permanente |
| GC: | DPR Construction, Inc. |
| Engineer: | Forell / Elsesser Engineers |
| Architect: | Ratcliff Architects |
PROJECT NARRATIVE
Kaiser Permanente is constructing a 64,700 square foot 3-story medical office building to provide additional services for its 40,000 San Mateo County members north of its Redwood City hospital campus. The medical office building has a contemporary design with precast concrete, glass and metal panels making up the majority of the exterior.
PROJECT CHALLENGES / SPECIAL CONSIDERATIONS
The building is designed to meet the Leadership in Energy and Environmental Design (LEED) standards. Currently, it meets the LEED® Silver rating. The site sustainability requirements pose the necessity to erect the building within its own footprint. Furthermore, an accelerated schedule of 4 weeks fabrication, 6.5 days steel assembly and 3 weeks thereafter to complete steel, deck and concrete over metal deck, maximizing full coordination with other sub-contractors.

