CoreSite SV-4 Data Center

Project Details

0
square feet
0
days to erect
Location: Santa Clara, CA
Owner: CoreSite
GC: MATT Construction
Engineer: FBA Engineers
Architect: DCM

Project Narrative

The ConXL System frame for this 100,000 ft2 data center was erected in 9 working days. The building was designed to LEED Gold standards, featuring energy efficiency initiatives such as 97% efficient UPS units, variable frequency drive (VFD) cooling units, and air-side economization. The data center is part of CoreSite’s 618,000 ft2 campus at Coronado Drive and Stender Way.

ConX Solutions

The ConXL System addressed CoreSite’s need for a robust, long-span steel data center steel frame delivered cost-effectively and with increased speed to market.

Download Project Bio

This project has a ConXL 400 chassis:

Lower & Locking™ Connection

ConXL 400

Height & Assembly Speed

  • 2 to 10 Stories

  • 10 to 15,000 ft2 per day

Design Parameters

Column Size 400 mm (16″ HSS or Box)
Beam Depth 18″ to 30″ for SMF, deeper for OMF
Beam Spans 18′ to 45’+