Thomas Berkley Square

Project Details

0
square feet
0
days to erect
Location:Oakland, CA
Owner:The Bedford Group
GC:UPA
Engineer:FBA Engineers
Architect:Holt Hinshaw Architects
Steel Fabricator:ConXtech Manufacturing
Steel Erector:ConXtech Construction
ConXtech Scope:Structural Steel, Stairs, Metal Decking, Exterior Panels

Project Narrative

Originally designed to be framed using bearing-wall light-gauge steel studs, The Bedford Group wanted to utilize the simplicity and speed of the ConX System. The 4 story above grade parking podium was under construction when the switch to ConX was made for the residential component of the project. Architects at Holt Hinshaw embraced the flexibility of the ConX System in adding 4 stories above the parking podium and 6 stories above the added retail podium.

ConX Solutions

The urban site logistics and minimal staging area made “Just In Time” delivery of all steel and exterior wall panels a requirement. The ConX frame was erected directly from the truck to its final place in the frame.

Photo Gallery