SANTA MONICA HIGH SCHOOL DISCOVERY
BUILDING Education
Project Data
Number of Collars | Bay Spacing | Structure Weight |
---|---|---|
153 | 38’-0” | 1360 tons |
0
square feet
0
days to erect
Location: | Santa Monica, CA |
---|---|
Owner: | Santa Monica -Malibu Unified School District |
GC: | McCarthy Construction |
Engineer: | Saiful Bouquet Structural Engineers |
Architect: | HED Design |
Steel Fabricator: | ConXtech / Zamil |
Steel Erector: | ConXtech |
ConXtech Scope: | Main Structural Steel |
Project Narrative
The Santa Monica High School Discovery Building is a new 3-story structure erected on top of podium level parking. This innovative building was designed using the “open building” design concept, with a flexible, open-column grid, raised floors and non-load bearing walls which can be reconfigured over time. ConXtech’s brace-free structural solution was an integral part of making that possible. The project has been recognized as the winner of the ENR California Best Projects 2022: Best K-12 Education, among various other recognitions.