CoreSite SV-5 Data Center

Project Details

0
square feet
0
days to erect
Location:Santa Clara, CA
Owner:CoreSite
GC:Hathaway Dinwiddie
Engineer:FBA Engineers
Architect:DCM
Steel Fabricator:ConXtech Manufacturing
Steel Erector:ConXtech Construction
ConXtech Scope:Structural Steel, Stairs, Metal Decking, Misc. Metals

Project Narrative

This 101,250 ft2 data center was erected in just 9 days. SV-5 is part of CoreSite’s 618,000 ft2 campus at Coronado Drive and Stender Way.

ConX Solutions

The ConXL System addressed CoreSite’s need for a robust, long-span steel data center frame delivered cost-effectively and with increased speed to market. ConXL’s inherent lack of shear walls and bracing allow for a fully open and reconfigurable floor plan which provides ultimate flexibility for mechanical system routing and future upgrades.