Kaiser Permanente, San Marcos

Project Details

0
square feet
0
days to erect
Location: San Marcos, CA
Owner: Kaiser Permanente
GC: Swinerton Inc.
Engineer: Hope Engineering
Architect: HMC Architects

Project Narrative

Kaiser Permanente is expanding the existing medical office building facility in San Marcos, California adding an additional 71,800 square foot 3-story facility directly adjacent to the current building. The building has a contemporary design with curtain wall and glass exterior and an significant exposed steel awning. The structure including trellis were erected in just 12 days, with the remaining decking, misc. metals and concrete fill completed over the subsequent 12 days.

Download Project Bio

This project has a ConXL 400 chassis:

Lower & Locking™ Connection

ConXL 400

Height & Assembly Speed

  • 2 to 10 Stories

  • 10 to 15,000 ft2 per day

Design Parameters

Column Size 400 mm (16″ HSS or Box)
Beam Depth 18″ to 30″ for SMF, deeper for OMF
Beam Spans 18′ to 45’+