Contra Costa County Administration Building

2019-08-15T16:13:27+00:00

Contra Costa County Administration Building Project Details square feet Location: Martinez, CA Owner: Contra Costa County GC: Hensel Phelps Engineer: Thornton Tomasetti Architect: Fentress Architects / KMD Architects Project Narrative Replacing the current Contra Costa County Administration building, this new four-story structure is designed to be more [...]

Godfrey Hollywood

2019-02-26T18:24:28+00:00

Godfrey Hollywood Project Details square feet days to erect Location: Hollywood, CA Owner: Five Chairs Development GC: Davis Reed Construction, Inc. Engineer: Englekirk Structural Engineering Architect: Steinberg Hart Architects Project Narrative This contemporary boutique hotel features 200 guest rooms, a restaurant space and a rooftop pool deck. [...]

Aera Pipe Rack

2019-02-21T18:41:36+00:00

Aera Pipe Rack Project Details Location: Bakersfield, CA Owner: Aera Energy LLC GC: Aera Energy LLC Engineer: Joshua Moody, S.E. Architect: Technical Services & Management Days to Erect: 20 Project Narrative Water Processing Plant on Central California Oil Field ConXtech has an ideal solution for Pipe Rack and Processing structures. [...]

Moffett Field

2019-02-27T22:45:24+00:00

Moffett Field Project Details square feet days to erect Location: Moffett Field, CA Owner: US Army Corps of Engineers GC: Walbridge/Overaa, a Joint Venture Engineer: GPLA – Gregory P. Luth and Associates Architect: Barge Wagonner Sumner & Cannon Project Narrative Armed Forces Reserve Center (AFRC) located at Moffett [...]

Navy Lodge

2019-02-28T00:06:36+00:00

Navy Lodge Project Details square feet days to erect Location: North Island, Coronado, CA Owner: US Navy (NAVFAC) GC: RQ Construction, LLC Engineer: GPLA – Gregory P. Luth and Associates Architect: RQ Construction, LLC Project Narrative This 146,500 ft2, 205 room Navy Lodge project was originally designed [...]

Santana Row

2019-02-27T23:37:41+00:00

Santana Row Project Details square feet days to erect Location: San Jose, CA Owner: Federal Realty Investment Trust Architect: MBH Architects Project Narrative In 2002 the nearly complete residential core of the Santana Row development in San Jose, CA, was devastated by a 13 alarm fire. Efforts [...]

550 Moreland

2019-02-27T23:47:43+00:00

550 Moreland Project Details square feet days to erect Location: Santa Clara, CA Owner: Prometheus GC: Palisade Builders Inc. Engineer: FBA Engineers Architect: Jon Worden Architects Project Narrative Located in Santa Clara, CA, this luxury apartment complex features two 8-story buildings and a rental & recreation building [...]

Broadway Grand

2019-02-27T23:49:18+00:00

Broadway Grand Project Details square feet days to erect Location: Oakland, CA Owner: Signature Development Group GC: Signature Development Group Engineer: Nishkian Menninger Architect: MBH Architects Project Narrative Located on the corner of Broadway and Grand in downtown Oakland CA, the 186,000 ft2 4 and 5 story ConX [...]

Stonegate

2019-02-06T22:34:21+00:00

Stonegate Project Details square feet days to erect Location: San Mateo, CA Owner: Syme Properties GC: R.D. Olson Architect: Jim Guthrie Associates (JGA) Project Narrative This three-story condominium complex was erected over an underground parking garage and is in close proximity to downtown San Mateo. [...]

8 Orchids

2019-02-27T23:50:51+00:00

8 Orchids Project Details square feet days to erect Location: Oakland, CA Owner: Bayrock Residential GC: JR Roberts Engineer: FBA Engineers Architect: HDO Architects Project Narrative This nine-story ConXR structure atop a 3-story concrete podium offers over 200,000 ft2 of residential space. Common areas include a 20-foot high [...]

Vidrio

2019-02-27T23:52:06+00:00

Vidrio Project Details square feet days to erect Location: Pittsburg, CA Owner: AF Evans Architect: Dahlin Group Project Narrative This 5-story, 120,100 ft2 mixed use development in Pittsburg, CA features 196 units on top of nearly 40,000 ft2 of retail space below. Also included are two public plazas. This [...]

Landmark Plaza

2019-02-27T23:54:01+00:00

Landmark Plaza Project Details square feet days to erect Location: Daly City, CA Owner: Landmark Daly City, LLC Architect: DIAP Project Narrative This 117,000 ft2, mixed-use infill project is located in Daly City, CA. The development also features ground level retail and an underground parking structure. The [...]

Esprit Park

2019-02-27T23:55:17+00:00

Esprit Park Project Details square feet days to erect Location: San Francisco, CA Owner: Build Inc. GC: Ross Construction Architect: Jon Worden Architects Project Narrative Esprit Park is a 162,122 ft2 luxury condominium project located in the heart of the historic Dog Patch district of San Francisco, CA. [...]

The Crossing

2019-02-28T00:04:40+00:00

The Crossing Project Details square feet days to erect Location: San Bruno, CA Owner: SNK Development GC: SNK Construction Architect: HDO Architects Project Narrative The Crossing’s two 5-story ConX structures provide 525,000 ft2 of luxury apartments and condominiums over a 2-level subterranean parking podium. Without the 4-story limitation [...]

The Arpeggio

2019-02-27T23:57:44+00:00

The Arpeggio Project Details square feet days to erect Location: Berkeley, CA Owner: SNK Development GC: SNK Construction Engineer: FBA Engineers Architect: WRNS Studio Project Narrative This 9-story, 143-unit condominium complex in downtown Berkeley, CA features 15,000 ft2 of retail on the first floor, and a 160-car subterranean [...]

Eighth & Grand

2019-02-28T00:04:22+00:00

Eighth & Grand Project Details square feet days to erect Location: Downtown Los Angeles, CA Owner: Carmel Partners GC: CP Construction Engineer: Englekirk Structural Engineering Project Narrative “Eighth & Grand,” located prominently in downtown Los Angeles, is a 7-story mixed use building with four levels of underground parking that [...]

Stanford Law School

2019-02-27T22:52:41+00:00

Stanford Law School Project Details square feet days to erect Location: Stanford, CA Owner: Stanford University GC: Dome Construction Engineer: Degenkolb Engineers Architect: Ennead Architects Project Narrative In the footprint once occupied by Kresge Auditorium, the new William H. Neukom academic building provides 65,000 sf of clinic, seminar, [...]

Southwestern College HEC

2019-02-19T19:11:45+00:00

Southwestern College HEC Project Details square feet days to erect Location: National City, CA Owner: Southwestern College GC: Sundt Construction Engineer: TTG Architect: Johnson Favaro Project Narrative This 2-story, 22,400 ft2 educational building on Southwestern College’s National City, CA campus features classrooms, a lecture hall, four laboratories and [...]

Lawson Lane

2019-02-27T22:46:42+00:00

Lawson Lane Project Details square feet days to erect Location: Santa Clara, CA Owner: Sobrato Development Company GC: Sobrato Construction Architect: Form4 Architects Project Narrative The Lawson Lane Campus, located at Central Expressway and San Tomas in Santa Clara, CA, is the development of three new office [...]

Nickelodeon Studios

2019-02-27T22:50:51+00:00

Nickelodeon Studios Project Details square feet days to erect Location: Burbank, CA Owner: Accord/BRO Members, LLC GC: McCormick Construction Engineer: Englekirk Architect: DLR Group Project Narrative This 110,000 ft2 expansion to Nickelodeon Studios’ existing 72,000 ft2 complex will serve as the West Coast “hub” for their animation and live-action production [...]

Kaiser Permanente, San Marcos

2019-02-01T18:33:32+00:00

Kaiser Permanente, San Marcos Project Details square feet days to erect Location: San Marcos, CA Owner: Kaiser Permanente GC: Swinerton Inc. Engineer: Hope Engineering Architect: HMC Architects Project Narrative Kaiser Permanente is expanding the existing medical office building facility in San Marcos, California adding an additional 71,800 [...]

San Jose State University, Student Wellness Center

2019-02-21T00:46:42+00:00

San Jose State University, Student Wellness Center Project Details square feet days to erect Location: San Jose, CA Owner: San Jose State University GC: Blach Construction Engineer: BKF/ Tipping Mar Architect: Ratcliff Architects Project Narrative This three-story, 53,000 ft2 facility on the San Jose State University campus provides [...]

Stanford Neuroscience Health Center

2019-02-27T22:26:19+00:00

Stanford Neuroscience Health Center Project Details square feet days to erect Location: Stanford, CA Owner: Stanford Health Care GC: Cahill Contractors Engineer: Degenkolb Engineers Architect: TEF Design Project Narrative Located on the Stanford University campus, this 92,000 ft2 medical office building is comprised of four levels of above [...]

Kaiser Permanente, Market Street

2019-01-31T18:52:32+00:00

Kaiser Permanente, Market Street Project Details square feet days to erect Location: Ventura, CA Owner: Kaiser Permanente GC: McCarthy Building Companies Engineer: John A. Martin & Associates Architect: Taylor Design Awarded “2018 Best Healthcare Project, Southern California” by ENR California! Project Narrative This 57,000 ft2 Kaiser Permanente [...]

Kaiser Permanente, Santa Rosa

2019-01-30T19:21:06+00:00

Kaiser Permanente, Santa Rosa Medical Office Project Details square feet days to erect Location: Santa Rosa, CA Owner: Kaiser Permanente GC: Turner Construction Engineer: Thornton Tomasetti / ConXtech Architect: Hawley Peterson Snyder Architects Project Narrative This three-story, 88,000 ft² medical office building will offer a wide range of [...]

NorthBay Hospital Expansion

2019-02-27T22:33:12+00:00

NorthBay Hospital Expansion Project Details square feet days to erect Location: Fairfield, CA Owner: NorthBay Healthcare GC: DPR Construction Engineer: Thornton Tomasetti Architect: Ratcliff Architects Project Narrative This 78,130 ft2 hospital expansion is an OSHPD-licensed critical care facility in Northern California designed using the ConXL System. The scope [...]

Kaiser Permanente, Irwindale

2020-02-11T21:53:48+00:00

This 196,500 ft², five-story medical office building sits on Kaiser Permanente’s existing 14-acre campus in Roseville, CA. This Kaiser facility will house multiple departments including opthalmology, women’s health, an MRI/imaging suite, optical sales, a pharmacy, and physical therapy. The ConX System easily accommodated the architectural features of the structure, including a large sweeping curved facade. The site where the medical office building is being constructed is also adjacent to both an existing Kaiser facility that remained open during construction and a parking garage that is under construction. The ConX System was an excellent, non-obtrusive solution to these particular site constraints.

CBU Engineering Facility

2019-02-27T23:04:58+00:00

CBU Engineering Facility Project Details square feet days to erect Location: Riverside, CA Owner: California Baptist University GC: Tilden Coil Constructors Engineer: Walter P. Moore Architect: Gensler Project Narrative This new Engineering facility at California Baptist University will provide classroom, faculty and administrative space. Large, hangar-style doors [...]

Kaiser Permanente, Beaverton

2019-01-10T16:54:51+00:00

Kaiser Permanente, Beaverton Medical Office Project Details square feet days to erect Location: Beaverton, OR Owner: Kaiser Permanente GC: Fortis Construction Engineer: KPFF Architect: PKA Architecture Project Narrative This three-story, 89,964 ft2 facility is a new model facility that incorporates both medical and dental care in one building.  It [...]

1450 Franklin

2019-01-10T16:56:46+00:00

1450 Franklin Project Details square feet days to erect Location: San Francisco, CA Owner: Village Properties Engineer: FBA Engineers Architect: BDE Project Narrative This 10-story ConXR steel structure sits atop four levels of concrete podium including garage space and retail. Comprised of 67 units, this luxury condominium complex [...]

Pacific City

2019-02-13T22:47:57+00:00

Pacific City Project Details square feet days to erect Location: Huntington Beach, CA Owner: DJM Capital GC: C.W. Driver Builders Engineer: FWC Structural Engineers  Architect: SMS Architects Project Narrative This 3-story ConXL structure sits atop a 2-story parking garage. Street level retail areas complete this innovative building [...]