Thomas Berkley Square Project Details square feet days to erect Location: Oakland, CA Owner: The Bedford Group GC: UPA Engineer: FBA Architect: Holt Hinshaw, San Francisco, CA Project Narrative Originally designed to be framed using bearing-wall light-gauge steel studs, The Bedford Group wanted to utilize the simplicity and speed [...]
550 Moreland
SKY12022-03-02T22:58:30-08:00550 Moreland Project Details square feet days to erect Location: Santa Clara, CA Owner: Prometheus GC: Palisade Builders Inc. Engineer: FBA Engineers Architect: Jon Worden Architects Project Narrative Located in Santa Clara, CA, this luxury apartment complex features two 8-story buildings and a rental & recreation building [...]
Moffett Field
SKY12022-03-02T22:57:20-08:00Moffett Field Project Details square feet days to erect Location: Moffett Field, CA Owner: US Army Corps of Engineers GC: Walbridge/Overaa, a Joint Venture Engineer: GPLA – Gregory P. Luth and Associates Architect: Barge Wagonner Sumner & Cannon Project Narrative Armed Forces Reserve Center (AFRC) located at Moffett [...]
Vidrio
SKY12022-03-02T22:59:13-08:00Vidrio Project Details square feet days to erect Location: Pittsburg, CA Owner: AF Evans Architect: Dahlin Group Project Narrative This 5-story, 120,100 ft2 mixed use development in Pittsburg, CA features 196 units on top of nearly 40,000 ft2 of retail space below. Also included are two public plazas. This [...]
Contra Costa County EOC Building
SKY12022-03-02T22:56:15-08:00Contra Costa County EOC Building Project Details square feet days to erect Location: Martinez, CA Owner: Contra Costa County GC: Hensel Phelps Engineer: Thornton Tomasetti Architect: Dreyfuss + Blackford Project Narrative This Emergency Operations Center (EOC) for Contra Costa County is set to replace the outdated existing [...]
Broadway Grand
SKY12022-03-02T22:58:41-08:00Broadway Grand Project Details square feet days to erect Location: Oakland, CA Owner: Signature Development Group GC: Signature Development Group Engineer: Nishkian Menninger Architect: MBH Architects Project Narrative Located on the corner of Broadway and Grand in downtown Oakland CA, the 186,000 ft2 4 and 5 story ConX [...]
Selma Tommie Hotel
SKY12022-03-02T22:55:26-08:00SELMA TOMMIE HOTEL Project Details square feet days to erect Location: Hollywood, CA Owner: Relevant Group GC: Suffolk Construction Company Engineer: Englekirk Structural Engineering Architect: STINBERG Project Narrative Selma Tommie Hotel is an 9 story a commercial building consists of 212 Hotel guest room with ground floor [...]
Mezzanine
SKY12022-03-02T22:55:26-08:00ConX for Mezzanine Structures Example: A 25’ x 25’ mezzanine module used part-time in a Hayward factory and part-time at events like Autodesk University. This particular structure is comprised of the ConXR 200 system and can be assembled or disassembled in just a few hours with 3 or 4 personnel. [...]
Landmark Plaza
SKY12022-03-02T22:59:26-08:00Landmark Plaza Project Details square feet days to erect Location: Daly City, CA Owner: Landmark Daly City, LLC Architect: DIAP Project Narrative This 117,000 ft2, mixed-use infill project is located in Daly City, CA. The development also features ground level retail and an underground parking structure. The [...]
Stonegate
SKY12022-03-02T22:58:51-08:00Stonegate Project Details square feet days to erect Location: San Mateo, CA Owner: Syme Properties GC: R.D. Olson Architect: Jim Guthrie Associates (JGA) Project Narrative This three-story condominium complex was erected over an underground parking garage and is in close proximity to downtown San Mateo. [...]
Navy Lodge
SKY12022-03-02T22:57:30-08:00Navy Lodge Project Details square feet days to erect Location: North Island, Coronado, CA Owner: US Navy (NAVFAC) GC: RQ Construction, LLC Engineer: GPLA – Gregory P. Luth and Associates Architect: RQ Construction, LLC Project Narrative This 146,500 ft2, 205 room Navy Lodge project was originally designed [...]
AC Marriott Hotel
SKY12022-03-02T22:57:42-08:00AC Marriott Hotel Project Details square feet days to erect Location: San Jose, CA Owner: PCA III, LLC Engineer: DLR Group Architect: DLR Group Project Narrative The AC Marriott Hotel is a seven-story, 210 room hotel comprising 79,500 square feet. Located in downtown San Jose, it is [...]
Santana Row
SKY12022-03-02T22:57:53-08:00Santana Row Project Details square feet days to erect Location: San Jose, CA Owner: Federal Realty Investment Trust Architect: MBH Architects Project Narrative In 2002 the nearly complete residential core of the Santana Row development in San Jose, CA, was devastated by a 13 alarm fire. Efforts [...]
Aera Pipe Rack
SKY12022-03-02T22:57:11-08:00Aera Pipe Rack Project Details Location: Bakersfield, CA Owner: Aera Energy LLC GC: Aera Energy LLC Engineer: Joshua Moody, S.E. Architect: Technical Services & Management Days to Erect: 20 Project Narrative Water Processing Plant on Central California Oil Field ConXtech has an ideal solution for Pipe Rack and Processing structures. [...]

Contra Costa County Administration Building
SKY12022-03-02T22:56:01-08:00Contra Costa County Administration Building Project Details square feet days to erect Location: Martinez, CA Owner: Contra Costa County GC: Hensel Phelps Engineer: Thornton Tomasetti Architect: Fentress Architects / KMD Architects Project Narrative Replacing the current Contra Costa County Administration building, this new four-story structure is designed [...]
Godfrey Hollywood
SKY12023-05-12T12:25:57-07:00Godfrey Hollywood Project Details square feet days to erect Location: Hollywood, CA Owner: Five Chairs Development GC: Davis Reed Construction, Inc. Engineer: Englekirk Structural Engineering Architect: Steinberg Hart Architects Project Narrative This contemporary boutique hotel features 200 guest rooms, a restaurant space and a rooftop pool deck. A [...]
800 High Street
SKY12022-03-02T22:58:01-08:00800 High Street Project Details square feet days to erect Location: Palo Alto, CA Owner: High Street Partners, LLC GC: Palisade Builders, Inc Architect: Jon Worden Architects Project Narrative This four-story luxury condominium complex is situated in the heart of downtown Palo Alto, CA, just a short [...]
8 Orchids
SKY12022-03-02T22:59:02-08:008 Orchids Project Details square feet days to erect Location: Oakland, CA Owner: Bayrock Residential GC: JR Roberts Engineer: FBA Engineers Architect: HDO Architects Project Narrative This nine-story ConXR structure atop a 3-story concrete podium offers over 200,000 ft2 of residential space. Common areas include a 20-foot high [...]
235 Berry Street
SKY12022-03-02T22:58:10-08:00235 Berry Street Project Details square feet days to erect Location: San Francisco, CA Owner: Signature Development Group GC: Devcon Architect: Leddy Maytum Stacy Architects Project Narrative Located just blocks from AT&T Stadium in the Mission Bay District of San Francisco, CA, this 127,000 ft2high-end condominium building [...]
Esprit Park
SKY12022-03-02T22:59:47-08:00Esprit Park Project Details square feet days to erect Location: San Francisco, CA Owner: Build Inc. GC: Ross Construction Architect: Jon Worden Architects Project Narrative Esprit Park is a 162,122 ft2 luxury condominium project located in the heart of the historic Dog Patch district of San Francisco, CA. [...]
The Crossing
SKY12022-03-02T22:59:47-08:00The Crossing Project Details square feet days to erect Location: San Bruno, CA Owner: SNK Development GC: SNK Construction Architect: HDO Architects Project Narrative The Crossing’s two 5-story ConX structures provide 525,000 ft2 of luxury apartments and condominiums over a 2-level subterranean parking podium. Without the 4-story limitation [...]
The Arpeggio
SKY12022-03-02T22:59:48-08:00The Arpeggio Project Details square feet days to erect Location: Berkeley, CA Owner: SNK Development GC: SNK Construction Engineer: FBA Engineers Architect: WRNS Studio Project Narrative This 9-story, 143-unit condominium complex in downtown Berkeley, CA features 15,000 ft2 of retail on the first floor, and a 160-car subterranean [...]
Eighth & Grand
SKY12022-03-02T22:59:48-08:00Eighth & Grand Project Details square feet days to erect Location: Downtown Los Angeles, CA Owner: Carmel Partners GC: CP Construction Engineer: Englekirk Structural Engineering Project Narrative “Eighth & Grand,” located prominently in downtown Los Angeles, is a 7-story mixed use building with four levels of underground parking that [...]
Van Nuys Assisted Living
SKY12022-03-02T22:59:48-08:00Van Nuys Assisted Living Project Details square feet days to erect Location: Van Nuys, CA Owner: 7040 Van Nuys Partnership, LLC GC: Landmark View, Inc. Engineer: Ashley & Vance Architect: Hochhauser Blatter Project Narrative This 80,500 ft2 assisted living facility in Van Nuys, CA features 132 units and [...]
Meridian Residences
SKY12022-03-02T22:59:48-08:00Meridian Residences Project Details square feet days to erect Location: Newport Beach, CA Owner: The New Home Company GC: Bernards Builders Engineer: Englekirk Architect: MVE Studio Project Narrative This five-building, 262,000 square foot luxury condominium and townhome development features 79 units ranging from 2,335 to 3,905 ft2. Its resort-like [...]
Hilton at The Source
SKY12022-03-02T22:59:48-08:00Hilton at The Source Project Details square feet days to erect Location: Buena Park, CA Owner: M&D Properties GC: Swinerton Builders Engineer: Englekirk Structural Engineering Architect: Gene Fong Associates Project Narrative This 94,000 ft2, 172-room Hilton hotel is part of The Source, a 400,000 ft2 urban destination center [...]
Stanford Law School
SKY12022-03-02T22:59:48-08:00Stanford Law School Project Details square feet days to erect Location: Stanford, CA Owner: Stanford University GC: Dome Construction Engineer: Degenkolb Engineers Architect: Ennead Architects Project Narrative In the footprint once occupied by Kresge Auditorium, the new William H. Neukom academic building provides 65,000 sf of clinic, seminar, [...]
Cal State University, Monterey Bay
SKY12022-03-02T22:59:49-08:00Cal State University, Monterey Bay Project Details square feet days to erect Location: Seaside, CA Owner: California State University Monterey Bay GC: Rudolph and Sletten Engineer: Thornton Tomasetti Architect: HMC Architects Project Narrative This 58,000 square foot building is the new home of the school of Business [...]
Marshall Elementary School
SKY12022-03-02T22:59:49-08:00Marshall Elementary School Project Details square feet days to erect Location: Anaheim, CA Owner: Anaheim City School District GC: Columbia Steel, Inc; Erickson-Hall Construction Engineer: Walter P. Moore Architect: BCA Project Narrative ConXtech’s scope includes this two-story, 43,604 square foot educational facility, erected in 18 days. The [...]
Southwestern College HEC
SKY12022-03-02T22:59:49-08:00Southwestern College HEC Project Details square feet days to erect Location: National City, CA Owner: Southwestern College GC: Sundt Construction Engineer: TTG Architect: Johnson Favaro Project Narrative This 2-story, 22,400 ft2 educational building on Southwestern College’s National City, CA campus features classrooms, a lecture hall, four laboratories and [...]
Lawson Lane
SKY12022-03-02T22:59:49-08:00Lawson Lane Project Details square feet days to erect Location: Santa Clara, CA Owner: Sobrato Development Company GC: Sobrato Construction Architect: Form4 Architects Project Narrative The Lawson Lane Campus, located at Central Expressway and San Tomas in Santa Clara, CA, is the development of three new office [...]
Nickelodeon Studios
SKY12022-03-02T22:59:49-08:00Nickelodeon Studios Project Details square feet days to erect Location: Burbank, CA Owner: Accord/BRO Members, LLC GC: McCormick Construction Engineer: Englekirk Architect: DLR Group Project Narrative This 110,000 ft2 expansion to Nickelodeon Studios’ existing 72,000 ft2 complex will serve as the West Coast “hub” for their animation and live-action production [...]
Casino M8trix
SKY12022-03-02T22:59:50-08:00Casino M8trix Project Details square feet days to erect Location: San Jose, CA Owner: M8trix GC: South Bay Construction Engineer: SEI Architect: ARC TEC, Inc. Project Narrative This 8-story, 36,000 ft² casino cardroom in San Jose, CA offers table games, card games and several restaurants & bars. [...]
The Village at Totem Lake
SKY12022-03-02T22:59:50-08:00The Village at Totem Lake Project Details square feet days to erect Location: Kirkland, WA Owner: CenterCal Properties, LLC GC: Robinson Construction Co. Engineer: John A. Martin & Associates Architect: IBI Group Project Narrative This 117,800 ft2 ConXL 400 structure in Kirkland, WA is part of an extensive [...]
SFO Airport Canopy
SKY12022-03-02T22:59:50-08:00SFO Airport Canopy Project Details square feet hours to erect Location: San Francisco, CA Owner: SFO Airport, City & County of San Francisco GC: Turner Construction Engineer: ConXtech Architect: Corgan / LDA Architects, Inc. Project Narrative This ConXL 400 canopy frame was assembled in 6 hours. Providing cover for a [...]
Building Y
SKY12022-03-02T22:59:50-08:00Building Y - Commercial Office Building Project Details square feet days to erect Location: Bakersfield, CA Owner: S.C. Anderson GC: S.C. Anderson Engineer: Engel & Company Architect: Milazzo & Associates Project Narrative This 3-story ConXL commercial office building is located in Bakersfield, CA. [...]
Kaiser Permanente, San Mateo
SKY12022-03-02T22:59:50-08:00Kaiser Permanente, San Mateo Project Details square feet days to erect Location: San Mateo, CA Owner: Kaiser Permanente GC: DPR Construction, Inc. Engineer: Forell / Elsesser Engineers Architect: Ratcliff Architects Project Narrative Kaiser Permanente built a 64,700 square foot 3-story medical office building to provide additional services [...]
Kaiser Permanente, San Marcos
SKY12022-03-02T22:59:50-08:00Kaiser Permanente, San Marcos Project Details square feet days to erect Location: San Marcos, CA Owner: Kaiser Permanente GC: Swinerton Inc. Engineer: Hope Engineering Architect: HMC Architects Project Narrative Kaiser Permanente is expanding the existing medical office building facility in San Marcos, California adding an additional 71,800 [...]
Kaiser Permanente, San Leandro
SKY12022-03-02T22:59:50-08:00Kaiser Permanente, San Leandro Project Details square feet days to erect Location: San Leandro, CA Owner: Kaiser Permanente GC: Rudolph and Sletten Engineer: Rutherford + Chekene Architect: Ellerbe Becket – AECOM Project Narrative This four-story, 275,000 square foot hospital support and medical office building sits adjacent to [...]
Fair Oaks Health Center
Ed Kim2019-02-09T00:29:15-08:00Fair Oaks Health Center Project Details square feet days to erect Location: Redwood City, CA Owner: Redwood City Medical Clinic GC: Turner Construction Company Engineer: Hohbach-Lewin, Inc Architect: DES Architects + Engineers Project Narrative This six-story, 35,000 ft2 medical office building provides space for a variety of [...]

San Jose State University, Student Wellness Center
SKY12021-12-16T22:07:30-08:00San Jose State University, Student Wellness Center Project Details square feet days to erect Location: San Jose, CA Owner: San Jose State University GC: Blach Construction Engineer: BKF/ Tipping Mar Architect: Ratcliff Architects Project Narrative This three-story, 53,000 ft2 facility on the San Jose State University campus provides [...]
Kaiser Permanente, Moreno Valley
Ed Kim2021-12-16T22:23:16-08:00Kaiser Permanente, Moreno Valley Project Details square feet Location: Moreno Valley, CA Owner: Kaiser Permanente GC: Hensel Phelps Engineer: John A. Martin & Associates Architect: HMC Architects Project Narrative This three-story, 73,760 square foot medical office building serves patients in greater Riverside County. ConX Solutions Herrick [...]

Stanford Neuroscience Health Center
SKY12021-12-16T22:13:42-08:00Stanford Neuroscience Health Center Project Details square feet days to erect Location: Stanford, CA Owner: Stanford Health Care GC: Cahill Contractors Engineer: Degenkolb Engineers Architect: TEF Design Project Narrative Located on the Stanford University campus, this 92,000 ft2 medical office building is comprised of four levels of above [...]
Riverside Community Hospital
SKY12021-12-16T22:06:58-08:00Riverside Community Hospital Project Details square feet days to erect Location: Riverside, CA Owner: HCA (Hospital Corporation of America) GC: DPR Construction Engineer: John A. Martin & Associates Architect: Perkins + Will Project Narrative This four-story, 61,400 ft2 ConXL structure is part of the Riverside Community Hospital’s $315 [...]
Kaiser Permanente, Chino Grand
SKY12021-12-16T21:36:24-08:00Kaiser Permanente, Chino Grand Project Details square feet days to erect Location: Chino Hills, CA Owner: Kaiser Permanente GC: Whiting-Turner Engineer: John A. Martin & Associates, ConXtech Architect: HDR Project Narrative Kaiser Permanente Chino Grand offers 57 patient exam rooms and 42 provider offices. This location will [...]
Centinela ER Addition (OSHPD)
Ed Kim2019-01-31T19:37:53-08:00Centinela ER Addition (OSHPD) Project Details square feet days to erect Location: Inglewood, CA Owner: Prime Healthcare Centinela, LLC GC: CNC Contractors Engineer: Degenkolb Architect: Puchlik Design Associates Project Narrative This structure is an OSHPD designed, 2,820 ft2 emergency room addition to the main hospital structure. ConX [...]
Kaiser Permanente, Murrieta
SKY12021-12-16T21:46:01-08:00Kaiser Permanente, Murrieta Project Details square feet days to erect Location: Murrieta, CA Owner: Kaiser Foundation Health Plan, Inc. GC: Pankow Engineer: John A. Martin & Associates Architect: Frank Webb Architects Project Narrative This 3-story ConXL structure sits atop a 2-story parking garage. Street level retail areas [...]
Kaiser Permanente, La Habra
SKY12021-12-16T21:38:24-08:00Kaiser Permanente, La Habra Project Details square feet days to erect Location: La Habra, CA Owner: Kaiser Permanente GC: Swinerton Builders Engineer: John A. Martin & Associates Architect: HMC Project Narrative This 29,800 ft2 medical office building located in La Habra, CA incorporates a new, community-minded design. In [...]
Kaiser Permanente, Skyport
SKY12021-12-16T21:50:06-08:00Kaiser Permanente, Skyport Project Details square feet days to erect Location: San Jose, CA Owner: Kaiser Permanente GC: HPM Construction Engineer: Thornton Tomasetti Architect: HMC Project Narrative This 147,700 ft2 structure is part of a massive Kaiser Permanente medical care campus situated on 10 acres in San Jose, [...]
Lake Health – Mentor, OH
Ed Kim2019-01-31T18:40:53-08:00Lake Health - Mentor, OH Project Details square feet days to erect Location: Mentor, OH Owner: Lake Mentor Properties LLC, Lake County Ohio Port Economic Development Authority GC: The Boldt Company Engineer: Ohlin & Reed Architect: TC Architects Project Narrative This 82,400 ft2 ConXL 400 structure is the [...]
Kaiser Permanente, Market Street
SKY12021-12-16T21:39:28-08:00Kaiser Permanente, Market Street Project Details square feet days to erect Location: Ventura, CA Owner: Kaiser Permanente GC: McCarthy Building Companies Engineer: John A. Martin & Associates Architect: Taylor Design Awarded “2018 Best Healthcare Project, Southern California” by ENR California! Project Narrative This 57,000 ft2 Kaiser Permanente [...]
Downtown West MOB
SKY12021-12-16T21:27:02-08:00Downtown West MOB Project Details square feet days to erect Location: Los Angeles, CA Owner: Robhana Group GC: Oltmans Construction Co. Engineer: KPFF Architect: Ware Malcomb Project Narrative ConXtech assembled this four-story, 57,700 ft² structure adjacent to the I-10 corridor in Los Angeles, one of the busiest [...]
Kaiser Permanente, Santa Rosa
SKY12021-12-16T21:48:29-08:00Kaiser Permanente, Santa Rosa Medical Office Project Details square feet days to erect Location: Santa Rosa, CA Owner: Kaiser Permanente GC: Turner Construction Engineer: Thornton Tomasetti / ConXtech Architect: Hawley Peterson Snyder Architects Project Narrative This three-story, 88,000 ft² medical office building will offer a wide range of [...]
NorthBay Hospital Expansion
SKY12021-12-16T22:04:45-08:00NorthBay Hospital Expansion Project Details square feet days to erect Location: Fairfield, CA Owner: NorthBay Healthcare GC: DPR Construction Engineer: Thornton Tomasetti Architect: Ratcliff Architects Project Narrative This 78,130 ft2 hospital expansion is an OSHPD-licensed critical care facility in Northern California designed using the ConXL System. The scope [...]
Kaiser Permanente, Irwindale
SKY12021-12-16T21:37:52-08:00This 196,500 ft², five-story medical office building sits on Kaiser Permanente’s existing 14-acre campus in Roseville, CA. This Kaiser facility will house multiple departments including opthalmology, women’s health, an MRI/imaging suite, optical sales, a pharmacy, and physical therapy. The ConX System easily accommodated the architectural features of the structure, including a large sweeping curved facade. The site where the medical office building is being constructed is also adjacent to both an existing Kaiser facility that remained open during construction and a parking garage that is under construction. The ConX System was an excellent, non-obtrusive solution to these particular site constraints.
CoastHills Credit Union
SKY12021-12-16T21:22:40-08:00Project Details square feet days to erect Location: Santa Maria, CA Owner: CoastHills Credit Union GC: Specialty Construction Engineer: John A. Martin & Associates Architect: Arris Studio Architects Project Narrative This 102,000 ft², three-story commercial office will be the new CoastHills Credit Union Headquarters [...]
CBU Engineering Facility
SKY12021-12-16T21:19:36-08:00CBU Engineering Facility Project Details square feet days to erect Location: Riverside, CA Owner: California Baptist University GC: Tilden Coil Constructors Engineer: Walter P. Moore Architect: Gensler Project Narrative This new Engineering facility at California Baptist University will provide classroom, faculty and administrative space. Large, hangar-style doors [...]
Kaiser Permanente, Beaverton
SKY12021-12-16T21:35:22-08:00Kaiser Permanente, Beaverton Medical Office Project Details square feet days to erect Location: Beaverton, OR Owner: Kaiser Permanente GC: Fortis Construction Engineer: KPFF Architect: PKA Architecture Project Narrative This three-story, 89,964 ft2 facility is a new model facility that incorporates both medical and dental care in one building. It [...]
CoreSite SV-7 Data Center
SKY12021-12-16T21:26:24-08:00CoreSite SV-7 Data Center Project Details square feet days to erect Location: Santa Clara, CA Owner: CoreSite GC: MATT Construction Engineer: FBA Engineers Architect: DCM Project Narrative This 230,000 ft2 data center was erected in just 15 days. SV-7 is the fourth data center using the ConX System [...]
CoreSite SV-6 Data Center
SKY12021-12-16T21:25:59-08:00CoreSite SV-6 Data Center Project Details square feet days to erect Location: Santa Clara, CA Owner: CoreSite GC: MATT Construction Engineer: FBA Engineers Architect: DCM Project Narrative This 136,000 ft2 data center was erected in just 9 days. SV-6 is the third CoreSite data center with a ConXL [...]
CoreSite SV-5 Data Center
SKY12021-12-16T21:25:27-08:00CoreSite SV-5 Data Center Project Details square feet days to erect Location: Santa Clara, CA Owner: CoreSite GC: Hathaway Dinwiddie Engineer: FBA Engineers Architect: DCM Project Narrative This 101,250 ft2 data center was erected in just 9 days. SV-5 is part of CoreSite’s 618,000 ft2 campus at Coronado Drive [...]
1450 Franklin
SKY12021-12-16T20:58:19-08:001450 Franklin Project Details square feet days to erect Location: San Francisco, CA Owner: Village Properties Engineer: FBA Engineers Architect: BDE Project Narrative This 10-story ConXR steel structure sits atop four levels of concrete podium including garage space and retail. Comprised of 67 units, this luxury condominium [...]
Bicycle Club Hotel & Casino
SKY12021-12-16T21:06:39-08:00Bicycle Club Hotel & Casino Project Details square feet days to erect Location: Bell Gardens, CA Owner: Bicycle Club GC: R.D. Olson Engineer: Englekirk Structural Engineering Architect: Lee & Sakahara Project Narrative This six-story, 71,730 ft2, hybrid linear/polar radial grid hotel tower was erected over a 30 [...]
Pacific City
SKY12021-12-16T22:06:25-08:00Pacific City Project Details square feet days to erect Location: Huntington Beach, CA Owner: DJM Capital GC: C.W. Driver Builders Engineer: FWC Structural Engineers Architect: SMS Architects Project Narrative This 3-story ConXL structure sits atop a 2-story parking garage. Street level retail areas complete this innovative building [...]
UC Merced Student Housing
SKY12021-12-16T22:17:50-08:00UC Merced Student Housing Project Details square feet days to erect Location: Merced, CA Owner: University of California, Merced GC: ProWest Constructors Engineer: GFDS Engineers Architect: EHDD Steel Erector: Bragg Crane & Rigging Co. "This was the smoothest structural system I’ve ever erected in my 30 years of [...]
CoreSite SV-4 Data Center
SKY12021-12-16T21:32:40-08:00CoreSite SV-4 Data Center Project Details square feet days to erect Location: Santa Clara, CA Owner: CoreSite GC: MATT Construction Engineer: FBA Engineers Architect: DCM Project Narrative The ConXL System frame for this 100,000 ft2 data center was erected in 9 working days. The building was designed to [...]